Areté Structures and Areté Engineers participated with the Friends of the Mountains-To-Sea Trail to construct an 80 foot pedestrian bridge over the Boone Fork in Price Park along the Blue Ridge Parkway.  Throughout the project, Areté was cooperative, responsive, proactive, flexible, and very professional.”

– John Lanman
Vice President Friends of the Mountain-To-Sea Trail

We have worked with Areté Structures on 2 projects in the recent past and have had a great experience on both.  The project in Georgia was built on top of existing abutments and had to be manufactured to fit correctly.  The material was delivered on time and assembled with ease due to quality control exercised by Areté Structures.”

– Aaron Creasman PE
Sr. Project Manager NHM Constructors

Areté Structures was a great company to work with.  Everything was ready when promised, no missing or wrong parts.  We would not even look anywhere else for our next FRP bridge project.”

– Dale Peterson
Project Manager Wuebben Construction